How to apply
Accepts applications
The return gives an application contact and rules, as below.
- Contact person
- On file
- Phone
- On file
- Mailing address
- On file
- Form and materials
- On file
- Deadlines
- None
- Restrictions
- Must support the mission of the Foundation and the industry.
Contact person, phone, mailing address and application materials on file. See them with a plan.
Assets and giving by year
-
Tax year 2025
$127,500
- Grants listed
- 10
- Assets, end of year
- $1,028,511
-
Tax year 2024
$188,750
- Grants listed
- 8
- Assets, end of year
- $815,898
-
Tax year 2023
$142,457
- Grants listed
- 5
- Assets, end of year
- $722,629
-
Tax year 2022
$196,250
- Grants listed
- 7
- Assets, end of year
- $750,548
-
Tax year 2021
$101,698
- Grants listed
- 3
- Assets, end of year
- $688,314
-
Tax year 2020
$207,392
- Grants listed
- 6
- Assets, end of year
- $758,493
Grants paid in 2025
As listed on the return.
-
2030 Inc Architecture 2030 IncSanta Fe, NM
A-105: Climate Positive Design for the Exterior Built Environment: Identify gaps areas for usage improvemet and integration with the existing Pathfinder tool and existing dataset. Update the tool with currently existing planning and landscape datasets as well as basic civil materials. Execute tool interface and output advancement capabilities.
$50,000 -
West Virginia University FoundationMorgantown, WV
This project investigates a supplemental damping system for a floor system long-span truss or stadium raker among other options. The testing involves vibration analysis to confirm anticipated performance.
$30,000 -
Charles Pankow FoundationHaymarket, VA
RGA 01-25: Behavior of Modular Steel Plate Floor Assemblies: This project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the AISC Need for Speed initiative to reduce the time from conception to occupancy for steel building structures.
$25,000 -
Charles Pankow FoundationMcLean, VA
RGA #04-23 Steel Mass Timber Hybrid Diaphragms and Vibration: aims to investigate the diaphragm and vibration behavior of steel-cross laminated timber CLT floors. This research will catalyze innovation within the building construction field by enabling efficient and effective designs of steel-CLT floors. Steel-CLT buildings are currently being constructed throughout the US. However the existing design guides for diaphragm and vibration design have not been developed through experimental data. Therefore the design of steel-CLT buildings may be overly conservative.
$22,500 -
University of MichiganPittsburgh, PA
A-101.3 This research project looks to advance Methods for the Efficient Estimation of the Reliability of Post-Elastic High-Rise Wind-Excited Structures within a Performance-Based Design PBD for high-rise buildings. Professor Seymour Spence is the principal investigator and is quoted as follows: Current high-rise structural wind design is hampered by difficulties in efficiently modeling the post-elastic non-linear structural behavior of the system therefore leading to challenges in estimating the reliability of these systems against severe windstorms. This research seeks to define a new paradigm for solving this problem through the development of probabilistic dynamic shakedown frameworks for the inelastic analysis of wind-excited structures. These methods have the potential to provide tools that enable the rapid evaluation as compared to time-history integration of the post-elastic reliability of a wide class of high-rise structures.
$0 -
Charles Pankow FoundationMcLean, VA
RGA 02-21 This research seeks to develop and experimentally validate bolded splice details for composite plate shear walls-concrete filled CPSW-CF to enable nationwide application of this structural system. The use of CPSW-CF structures leverage steel pre-fabrication in the shop and stay-in-place formwork to reduce the time spent on site and accelerates the construction schedule. Professor Bruneau from the University of Buffalo serves as the principal investigator.
$0 -
Building TransparencySeattle, WA
A-104 The carbon results framework project: the goal of the ec3 tool project is to transform building construction by transparently measuring comparing and reducing embodied carbon emission from construction materials. each year the built environment contributes almost 40% of co2 emission worldwide and it is estimated that there will be a doubling of the amount of building floorspace in the next 40 years. at least half of the carbon footprint of these new building will take the form of embodied carbon in the emissions associated with the building construction including extracting transporting manufacturing and installing building materials. as a result owners designers engineers and contactors are turning their attention to building material seeking information on these products so they can make informed smart choices. the ec3 tool would enable the building industry to easily access and view material carbon emissions data.
$0 -
Charles Pankow FoundationMcLean, VA
rga 01-22 Behavior of modular steel plate floor assemblies: this project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the aisc for initiative to reduce the time from conception to occupancy for steel building structures.
$0 -
Charles Pankow FoundationMcLean, VA
RGA -5-22 Performance based structural fire design for authorities having jurisdiction officials: this project will develop educational training materials to introduce AJH to the topic of performance-based structural fie design pbsfd. These materials will assist AHJ to gain an understanding of the goals objectives fire scenarios thermal and structural analyses for pbsfd. After completing the training ahj will be able to review pbsdf designs along with their assumptions limitations can caveats. They will be able to effectively manage relationships between the engineering team and the peer review panel and make final decisions based on buildings codes for steel concrete masonry and wood structures. The educations materials will include slides recorded presentations guideline documents recordings of live workshops seminars and discussions by expert panels in the field of structural fire engineering fire protection engineering and performance-based design.
$0 -
Charles Pankow FoundationHaymarket, VA
RGA 03-23:Behavior of modular steel plate floor assemblies: this project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the aisc for initiative to reduce the time from conception to occupancy for steel building structures. This is the next phase after RGA 01-22.
$0
Where the money goes
By cause: grants to organizations we matched to the IRS list of exempt organizations, by their category.
- Education1 grant $30,000100% of the total
By State
Grants to organizations with a US address, latest year.
- New Mexico1 grant $50,000
- Virginia6 grants $47,500
- West Virginia1 grant $30,000
- Pennsylvania1 grant $0
- Washington1 grant $0
Officers, directors and trustees
As filed on the return, with average hours per week and pay from the foundation.
- Ronald KlemencicPresident Hours 1Pay $0
- Bill ChristopherTreasurer Hours 1Pay $0
- Robert BaxterDirector Hours 1Pay $0
- Matt JonesDirector Hours 1Pay $0
- Beatriz ArosteguiDirector Hours 1Pay $0
- Russell LarsonDirector Hours 1Pay $0
The return
More foundations
- Private foundations in Washington
- Private foundations in Seattle
- Foundations that fund education in Washington
- Foundations that fund environment in Washington
Similar foundations
Same main cause (education), giving between a quarter and four times this foundation’s where possible, nearby first.
- Entelco Foundation 39 grants Preselected only $129,250 giving
- Bishop Fleet Foundation 42 grants Accepts applications $129,500 giving
- Sara Little Turnbull Foundation 8 grants Preselected only $140,000 giving
- DLSC Family Foundation 2 grants Preselected only $155,000 giving
- William and Martha Erickson Foundation 16 grants Preselected only $103,750 giving